Loader
yeo group

Türkoglu 4,4 MW Solar Power Plant

Country: Turkey, Konya;

End-User: YEO;

Project: Türkoglu Solar Power Plant;

Description: Solar Power Plant 4.4 MVA, 36.720 Solar Panels; String Inverters;

Scope of works:

  • 3 pcs MV Transformers, Switchgear and ABB Central Inverters;
  • Solar Panels;
  • Electrical Design;
  • Electrification works for MV and LV utilities;
  • Cabling Works, Cable Trays and Conduit Installation;
  • RTU Panels, IEC104 with Main Control Center Communication;

 

Shuakhevi Hydro Power Plant
Shuakhevi Hydro Power Plant

Country: Georgia; End-User: AGE BATUM CO. LTD; Project: Shuakhevi Hydro Power Plant Energy SCADA System Description: The Shuakhevi Hydropower Project is the first scheme of the Adjaristsqali hydro power cascade. The project has...

More
Türkoglu 4,4 MW Solar Power Plant
Türkoglu 4,4 MW Solar Power Plant

Country: Turkey, Konya; End-User: YEO; Project: Türkoglu Solar Power Plant; Description: Solar Power Plant 4.4 MVA, 36.720 Solar Panels; String Inverters; Scope of works: 3 pcs MV Transformers, Switchgear and ABB Centr...

More
Isparta 2,2 MW Solar Power Plant
Isparta 2,2 MW Solar Power Plant

Country: Turkey, Isparta; End-User: Portsan; Project: Isparta Keçiborlu Solar Power Plant; Description: Solar Power Plant 2.2 MVA, 6.700 Solar Panels, 2 Central Inverters; Scope of works: 2 pcs MV Transformers, Switc...

More
Cihanbeyli 3 MW Solar Power Plant
Cihanbeyli 3 MW Solar Power Plant

Country: Turkey, Konya; End-User: SEISO; Project: Cihanbeyli Solar Power Plant; Description: Solar Power Plant 3.3 MVA, 9.850 Solar Panels, 3 Central Inverters; Scope of works: 3 pcs MV Transformers, Switchgear and ABB Cent...

More
Elmalı 6 MW Solar Power Plant
Elmalı 6 MW Solar Power Plant

Country: Turkey, Antalya; End-User: Portsan; Project: Elmali Solar Power Plant; Description: Solar Power Plant 6 MVA, 19.800 Solar Panels, 6 Central Inverters; Scope of works: 6 pcs MV Transformers, Switchgear and ABB ...

More
Cerit WPP Substation Automation
Cerit WPP Substation Automation

Country: Turkey, Adiyaman; End-User: BEST AS; Project: Cerit Wind Power Plant Substation Automation Project; Description:154 kV Air Insulated Substation, Capacity 75 MVA, 25 Wind Turbines, 154 kV: 1 Line Feeder, 2 Transformer F...

More
Tursunlu 11,2 MW Solar Power Plant
Tursunlu 11,2 MW Solar Power Plant

Country: Turkey, Konya; End-User: Kinesis Enerji; Project: Tursunlu 11,2 MW Solar Power Plant; Description: Solar Power Plant 10 MVA, 32.740 Solar Panels, 10 Central Inverters; Scope of works: 10 pcs MV Transformers, Switch...

More
Soma Kolin 2x255 MW TPP
Soma Kolin 2x255 MW TPP

Country:  Turkey; End-User:  Kolin Construction; Project:  Soma Kolin 2x255 MW TPP; Scope of works: Design & Technical Consultancy; MENR Project Approval; TEIAS Integration and Test Design; Provisional ...

More
yeo group